Farragon Project
_
Made with
Cinema 4D
After Effects
Photoshop
Audition
Commissioned by BP, and forming part of an accompanying information resource guide, this animation is a simulation of the offshore dual Xmas Tree deck testing and deployment operation sequences that took place onboard an offshore oil platform.
It showcases the procedure once both reservoir sections have been drilled and Open Hole Gravel pack operations have been completed. The final output was used to provide rig personnel with a detailed deck management plan required for assembly and deck testing of the subsea Xmas trees prior to deployment which had been optimised to minimise lifting.